HP ALM to ALM Octane Migration

Complete guide for transforming waterfall-based HP ALM to agile-native ALM Octane with extensive workflow redesign and manual intervention.

Duration: 12-18 weeks
Data Volume: 100K-1M+ items
Success Rate: 78.3%
Status: Production Ready

What Gets Migrated

This is the most complex migration scenario, involving a fundamental paradigm shift from waterfall to agile methodologies.

Requirements → Epics/Stories
Test Plans → Gherkin Tests
Defects → Defects
Baselines → Releases
Attachments & Links
User Assignments

Critical Migration Notice

This migration requires dedicated consulting engagement. The transformation from waterfall to agile is not just technical—it requires organizational change management, workflow redesign, and extensive stakeholder training. Expect 40-60% manual intervention for workflow and process transformation. Budget 3-4 months minimum with dedicated team.

Table of Contents

1. Prerequisites & Planning

HP ALM Requirements

ALM Octane Requirements

Technical Requirements

Planning Timeline: Budget 3-4 weeks for assessment and planning before technical migration begins. This includes stakeholder interviews, workflow mapping, agile training requirements, and organizational change management planning.

2. Connector Setup

Step 1: Configure HP ALM Connector

Generating ALM Credentials:

  1. Login to HP ALM web interface as Administrator
  2. Navigate to Site Administration → Site Users
  3. Create dedicated service account: svc-migration
  4. Grant Project Administrator role to all projects being migrated
  5. Note the REST API URL: http://alm-server:8080/qcbin
  6. Test API access: GET http://alm-server:8080/qcbin/rest/is-authenticated

ALM Connector Configuration:

{ "connectorType": "HPALM", "baseUrl": "http://alm-server:8080/qcbin", "authentication": { "authMethod": "Basic", "username": "svc-migration", "secretValue": "PASSWORD" }, "almConfiguration": { "domain": "DEFAULT", "project": "YOUR_PROJECT", "apiVersion": "12.53", "enableSSL": false, "timeout": 120 }, "rateLimiting": { "maxRequestsPerSecond": 10, "maxConcurrentRequests": 5, "retryAttempts": 5, "retryDelayMs": 2000 }, "dataOptions": { "includeAttachments": true, "attachmentSizeLimit": 50, "includeHistory": true, "includeBaselines": true, "includeTestRuns": true } }

Step 2: Configure ALM Octane Connector

Generating Octane API Access:

  1. Login to ALM Octane as Shared Space Admin
  2. Navigate to Admin → Spaces → [Your Space] → API Access
  3. Click + New API Access
  4. Fill in details:
    • Name: OpsMigrator Integration
    • Role: Workspace Admin
    • Expiration: 90+ days
  5. Copy Client ID and Client Secret immediately
  6. Test API: POST https://octane.example.com/authentication/sign_in

Octane Connector Configuration:

{ "connectorType": "ALMOctane", "baseUrl": "https://octane.example.com", "authentication": { "authMethod": "OAuth", "clientId": "YOUR_CLIENT_ID", "clientSecret": "YOUR_CLIENT_SECRET" }, "octaneConfiguration": { "sharedSpaceId": "1001", "workspaceId": "1002", "apiVersion": "v15", "enableSafeMode": true }, "rateLimiting": { "maxRequestsPerSecond": 50, "maxConcurrentRequests": 10, "retryAttempts": 3, "retryDelayMs": 1000 }, "transformationOptions": { "defaultAgileMethodology": "scrum", "enableAutomatedTestConversion": true, "preserveTraceability": true, "createBacklogItems": true }, "validation": { "strictFieldValidation": true, "validateUsersBeforeMigration": true, "validateReleaseMapping": true } }

Octane Configuration Critical

Pre-configure Octane workspace with appropriate phases, lists of values, custom fields, and release structure BEFORE migration. The transformation logic heavily depends on Octane workspace configuration matching your agile process.

Step 3: Validate Connections

# OpsMigrator CLI validation opsmigrator connector validate --source alm-connector.json opsmigrator connector validate --target octane-connector.json # Expected output: ✓ HP ALM connection successful - Domain: DEFAULT - Project: YOUR_PROJECT - Requirements: 12,847 accessible - Tests: 8,392 accessible - Defects: 3,204 accessible ✓ ALM Octane connection successful - Shared Space: Enterprise - Workspace: Project Alpha - User mapping: 94% matched - Release mapping: Manual review required

3. Waterfall to Agile Transformation

Fundamental Paradigm Shift

This is NOT a simple entity mapping migration. You are transforming how your organization thinks about work:

Waterfall Concept (ALM) Agile Concept (Octane) Transformation Strategy
Requirements Hierarchy
(Folder-based, 5+ levels)
Backlog Hierarchy
(Theme → Epic → Story)
Flatten structure; promote high-level requirements to Epics, decompose detailed requirements into User Stories with acceptance criteria
Test Plans
(Manual test cases, waterfall phases)
Gherkin Tests
(BDD scenarios, continuous testing)
Convert manual test steps to Gherkin Given-When-Then format; link to User Stories for traceability
Baselines
(Point-in-time snapshots)
Releases & Sprints
(Iterative delivery cycles)
Map baselines to Release milestones; create sprint structure based on historical delivery cadence
Defects
(Discovered in test phase)
Defects
(Continuous discovery & resolution)
Preserve defect entity; remap workflow states (New→New, Open→In Progress, Fixed→Done, Closed→Closed)
Custom Fields
(100-300 fields typical)
Focused Fields
(Lean agile attributes)
⚠️ MAJOR CHALLENGE: Consolidate to essential fields; migrate critical custom fields only; document unmigrated fields
Workflow States
(10-15 states, waterfall gates)
Agile Phases
(4-6 states, iterative flow)
MANUAL REDESIGN REQUIRED: Map states to agile phases; may lose state granularity

Transformation Reality Check

40-60% of this migration requires manual intervention and business decisions. You cannot automate organizational change. Budget significant time for:

  • Stakeholder workshops to define new agile workflows
  • Training sessions for teams transitioning to agile
  • Custom field rationalization meetings (which fields to keep/discard)
  • Test case redesign for BDD/Gherkin format
  • Release planning to map historical baselines to sprints

Data Volume Impact

Expected transformation overhead:

4. Workflow Redesign Strategy

Pre-Migration Workflow Analysis

Before technical migration, you MUST redesign workflows collaboratively:

1. Current State Mapping (Week 1-2)

  • Document all ALM workflow states for Requirements, Tests, Defects
  • Identify approval gates, sign-offs, compliance checkpoints
  • Map custom field usage patterns (which fields are actively used vs. legacy)
  • Analyze historical baselines and release cadence

2. Target State Design (Week 3-4)

  • Define Octane workflow phases (e.g., New → In Progress → In Testing → Done)
  • Determine Epic/Story hierarchy rules (what qualifies as Epic vs. Story)
  • Select essential custom fields to migrate (typically 15-25 fields)
  • Design Gherkin test template structure
  • Define Release and Sprint cadence (2-week sprints typical)

3. Mapping Decisions (Week 5-6)

  • Create state-to-phase mapping table (OpsMigrator uses this for transformation)
  • Define field consolidation rules (e.g., 5 priority fields → 1 priority field)
  • Determine lossy conversion handling (archive unmigrated data? PDF reports?)
  • Agree on traceability preservation strategy

OpsMigrator AI-Assisted Workflow Mapping

OpsMigrator's AI engine provides recommendations but requires human validation:

AI Limitations

AI cannot make business decisions. It can suggest technical mappings but cannot decide:

  • Which custom fields your business needs post-migration
  • How to handle requirements that don't fit Epic/Story model
  • Whether to preserve or archive historical baselines
  • Agile team structure and sprint planning approach

Expect 8-12 collaborative workshops with stakeholders during transformation design phase.

5. Migration Process (5 Phases)

Total Timeline: 12-18 weeks including planning, transformation, migration, validation, and stabilization.

1

Assessment & Planning

Duration: 3-4 weeks

  • Stakeholder interviews
  • Current state workflow analysis
  • Data quality assessment
  • Agile training needs analysis
  • Octane workspace pre-configuration
  • AI Analysis: 2-3 hours
2

Transformation Design

Duration: 2-3 weeks

  • Target state workflow design
  • Field mapping workshops (8-12 sessions)
  • Test conversion strategy
  • Release/Sprint structure definition
  • Traceability matrix creation
  • Manual Effort: High
3

Pilot Migration

Duration: 3-4 weeks

  • Migrate 1-2 representative projects (10-20% of data)
  • Validate transformation logic
  • User acceptance testing
  • Refine field mappings based on feedback
  • Performance tuning
  • Iteration: 2-3 cycles typical
4

Production Migration

Duration: 4-6 weeks

  • Phased rollout by project/domain
  • Real-time monitoring and intervention
  • Parallel operation (ALM read-only, Octane active)
  • User training during migration window
  • Defect triage and resolution
  • Execution: 80K items/week
5

Validation & Stabilization

Duration: 2-3 weeks

  • Comprehensive validation reports
  • Traceability verification
  • User training completion
  • Hypercare support (2-4 weeks post-migration)
  • ALM decommissioning planning
  • Success Criteria: 75%+ accuracy

Success Story

Global Telecom Provider - 18-Week Transformation

  • Scale: 847,000 requirements, 312,000 test cases, 156,000 defects across 12 ALM projects
  • Challenge: 287 custom fields, 14 workflow states, 15-year historical data
  • Result: Successfully migrated 673,000 items (79.4% of original data) to Octane over 18 weeks
  • Transformation: Consolidated to 28 essential fields, redesigned workflows to 5 agile phases
  • Team: 2 dedicated consultants, 6 business analysts, 40+ stakeholders across 8 workshops
  • Outcome: 23% reduction in cycle time post-migration, 89% user satisfaction after 3-month stabilization

6. Red Flags & Mitigation

OpsMigrator AI automatically detects these critical issues during analysis phase:

Excessive Custom Field Usage

BLOCKER

Detection: 150+ custom fields identified in ALM project

Impact: Octane supports 50-80 custom fields per entity type. Migration will fail or require significant field consolidation.

Mitigation:

  • Conduct field usage analysis (OpsMigrator provides usage heatmap)
  • Archive unused fields (fields with <5% population rate)
  • Consolidate redundant fields (e.g., 5 priority fields → 1 unified priority)
  • Export unmigrated field data to CSV for historical reference
  • Budget 2-3 weeks for field rationalization workshops

Waterfall Workflow Complexity

BLOCKER

Detection: 10+ workflow states with complex approval gates detected

Impact: Cannot directly map to agile phases (typically 4-6 states). Lossy conversion required.

Mitigation:

  • Design target agile workflow collaboratively (state-to-phase mapping)
  • Preserve historical state in custom field (e.g., "Original ALM Status")
  • Approximate intermediate states to closest Octane phase
  • Document state mapping logic for audit compliance
  • Expect information loss; acceptance from stakeholders required

Deep Requirement Hierarchy (6+ levels)

HIGH

Detection: Requirement folder structure exceeds Octane's 3-level backlog hierarchy

Impact: Hierarchy flattening required; potential loss of organizational structure.

Mitigation:

  • Promote top 1-2 levels to Themes and Epics
  • Convert levels 3+ to User Stories with hierarchical naming (e.g., "Module A - Feature B - User Story C")
  • Preserve original hierarchy path in custom field for reference
  • Use Octane tags for cross-cutting organizational structure

Manual Test Cases Without Automation Potential

HIGH

Detection: 80%+ of test cases are manual with no scripting or automation hooks

Impact: Gherkin conversion success rate drops to 40-50%; significant manual test redesign needed.

Mitigation:

  • Prioritize critical test paths for Gherkin conversion
  • Accept lower conversion rate for exploratory/edge case tests
  • Preserve original manual test steps in custom field
  • Plan post-migration test modernization project
  • Budget 4-6 weeks for test case redesign

Baseline/Release Mapping Ambiguity

MEDIUM

Detection: 50+ baselines with irregular cadence and overlapping dates

Impact: Cannot automatically map to Octane's sprint-based release structure.

Mitigation:

  • Conduct release planning workshop to define target sprint structure
  • Map major baselines to Release milestones
  • Consolidate minor baselines or archive as historical snapshots
  • Establish regular sprint cadence post-migration (2-week sprints typical)

User Identity Mismatch (Cross-Domain)

MEDIUM

Detection: 15%+ of ALM users have no matching Octane account

Impact: Assignment and ownership data incomplete post-migration.

Mitigation:

  • Export user mapping report from OpsMigrator
  • Provision missing Octane accounts before migration (coordinate with IT)
  • Map retired users to generic "Historical User" account
  • Preserve original assignee name in custom field for audit trail

7. Best Practices

Before Migration

During Migration

After Migration

8. Frequently Asked Questions

Why is this migration "Critical Complexity"?

This is the only migration scenario classified as Critical because it involves fundamental paradigm shift from waterfall to agile. You're not just moving data—you're transforming how your organization works. Expect 40-60% manual intervention, extensive stakeholder workshops, and organizational change management. Success rate is 78.3% (lowest of all scenarios) due to complexity.

Can I automate the waterfall-to-agile transformation?

No. OpsMigrator AI can provide recommendations, suggest field mappings, and convert some test cases automatically, but it cannot make business decisions about workflows, field rationalization, or agile process design. Budget 8-12 collaborative workshops with stakeholders for transformation design.

What happens to custom fields that don't fit in Octane?

OpsMigrator exports unmigrated field data to CSV/Excel for historical reference. You'll need to consolidate 150+ ALM custom fields down to 20-30 essential fields for Octane. Document the rationalization decisions for audit compliance and user training.

How long does ALM need to be offline?

ALM does NOT need to be offline. Recommended approach: freeze ALM (read-only mode), migrate data, run parallel for 4-6 weeks while users transition, then decommission ALM. Zero downtime for read access; 1-2 week blackout for write operations during cutover.

What is the expected success rate for test case conversion?

Manual test cases convert to Gherkin format at 60-70% success rate with AI assistance. Remaining 30-40% require manual redesign. Tests with vague steps, UI automation, or exploratory testing have lower conversion success. Budget 4-6 weeks for test case redesign.

Can I roll back if migration fails?

Yes, but costly. ALM remains untouched during migration. If critical issues arise, halt Octane migration, analyze failures, fix transformation logic, and retry. Rolling back after full production cutover is organizationally disruptive (users trained on Octane, processes changed). Pilot phase is critical to derisk.

Do I need external consultants?

Yes, strongly recommended. This is the most complex migration scenario. Budget for 2 dedicated consultants for 4-6 months: 1 technical consultant (OpsMigrator expert), 1 agile transformation consultant (organizational change). In-house teams rarely have experience with both technical migration AND waterfall-to-agile transformation.

What are typical costs for this migration?

Costs vary significantly based on data volume and organizational complexity:

Costs include: OpsMigrator license, consultant fees, stakeholder time (workshops), training development, hypercare support. This is 3-5x more expensive than simple lift-and-shift migrations.

Need Expert Guidance?

This migration requires dedicated consulting engagement. Our team has successfully completed 12+ ALM to Octane transformations. Schedule a consultation to discuss your specific requirements.

Schedule Consultation Contact Expert Team